Measure: $225,000 - Nathaniel Witherell - Sewer Drain Replacement
Passed on 2024-06-10
Approve the appropriation of $225,000 to account H450 59070 for the replacement of the severely scaled and corroded 4-inch cast iron stack at the Nathaniel Witherell facility. This main drain supports the entire building and connects to all showers, sink drains, and toilets. Consulting engineers have recommended pipe replacement over pipe relining to optimize stability and useful life. The existing system, installed during the original construction in 1976, has resulted in over $100,000 in related expenses from FY2022 to present due to blockages and failures.
Description generated by ChatGPT from explanos.
Related measures: